September 20, 2016

 

Pilot processing testworks for Khinganolovo tailings project

Khingan Resources Limited ("Khingan Resources" or the "Company") is pleased to announce that pilot processing tests have been succefully carried out together with Pro Eurasia (russian offical representative of Sepro Mineral Systems) directly on the industrial site of the Khinganolovo tailings project. The feed material was screened at 70 Mesh (212 μm), with the screen undersize subjected to 2-Stage, gravity test on the iCON IGR-100 comlpex with centrifugal concentrator. As a result of tests tin tailings responded well to centrifugal gravity concentration, resulting in high tin recovery. 2 stage gravity circuit samples have been sent to two separate leboratories in Australia and Canada for flotation tests. The Company expects to receive first results in November 2016.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Enquires:

Khingan Resources Limited

Telephone: +7 42622 20005

Email: info@khinganresources.com

Back to News

News

 

 

Khingan Resources Limited 

Reg. No 1732270

812 Silvercord, Tower 1, 30 Canton Road,

Tsimshatsui, Kowloon, Hong Kong

www.khinganresources.com